1. BATCH 001 MANUFACTURE INTERVALS

Because Point Five Press LLC artifacts are engineered to precise physical tolerances and utilize custom high-tensile materials, manufacturing is executed in dedicated, serialized intervals rather than mass production lines. All allocations secured during this window are assigned to the Summer 2026 Pre-Order Launch matrix. Estimated fulfillment windows are provisional and contingent upon strict manufacturing verification and quality assurance logging.

2. BATCH ALLOCATION FINALITY POLICY

Because specialized raw materials, finishing treatments, and precision machine shop hours are allocated based on the precise volume of verified priority reservations, all Batch 001 pre-order allocations are considered final. Once an allocation enters the active manufacturing queue, reservations cannot be canceled, amended, or refunded.

3. INSPECTION & QUALITY ASSURANCE DISPATCH

Every individual artifact undergoes manual physical inspection, structural certification, and serialization archiving prior to secure dispatch. In the highly exceptional event that an artifact arrives with a verifiable structural compromise sustained during transit, the operator must document the packaging and contact terminal administration within 48 hours of delivery confirmation to initiate an insurance review.

4. DISPATCH COURIER & TRANSIT

Once an allocation passes mechanical QA, it is securely packaged and handed over to premium transit couriers with full tracking enabled. Point Five Press LLC is not responsible for transit delays, localized carrier losses, or delivery disruptions caused by regional customs operations, severe weather intervals, or logistics carrier network failures.